- When
- 4 September 2023
- Where
- Batticaloa
- Format
- Infrastructure survey
On 4 September 2023 the lab infrastructure was photographed in a single survey, split into electronics, media and software sets. It is the clearest evidence of when the three-lab configuration was complete, and a separate set filed the same day sits in the electromechanics lab’s own records.
No standing list of labs is published here, and the default count is zero. A dated photograph of what existed on one day in September 2023 is what this entry claims, and nothing more.