Milestone, 2023

Three labs, documented

A single dated survey of the electronics, media and software labs as finished infrastructure.

When
4 September 2023
Where
Batticaloa
Format
Infrastructure survey

On 4 September 2023 the lab infrastructure was photographed in a single survey, split into electronics, media and software sets. It is the clearest evidence of when the three-lab configuration was complete, and a separate set filed the same day sits in the electromechanics lab’s own records.

No standing list of labs is published here, and the default count is zero. A dated photograph of what existed on one day in September 2023 is what this entry claims, and nothing more.

All activities